If connected load of Asphalt plant is 375Kw. What suitable
KVA DG set is required. What is calculation formula. what
extra load have to consider. in what efficiency it will
work.
Answer Posted / srinivas
if the connected load of plant is 375kw. but any time all
the load may not be there. if peak load may be 300kw at any
instant so KVA rating of DG=KW/cos(phi) so you can take
300/0.9= 333.33 so you can take 350KVA Dg you can go for.
Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
if the motor rated speed is 950rpm. how to change the above rated speed? is it possible?
why they were using TRIAC instead relay in some controllers and what is the advantages.
Please explain the following and how these are working with PLC unit 1.I/O Module 2.I/O Device 3.Adaptor Card 4.Ribbon Adaptor 5.RS 485-FC
How do we calculate transformer oil in liter from the rating of the transformer.
please tell me when we start motor without load in star or delta connection whose current above condition,pl write formula
If a shunt Dynamo has induced emf 100V and 0.4 ohm resistance and battery of accumulator of open circuit emf 110V and 0.5 Ohm resistance are in parallel what is common terminal potential difference?
How we can calculate the Amps for the cable Ex:- For 1sqmm wire how many amps we can draw (calculation)
how to calculate fault level?
what is the practical application of full adder circuit?
what about GD square and its important for motor design?
What are the classifications of heating element?
What is the principal of motor?
How will A Medium voltage circuit breaker(11 kV voltage level) operate under short circuit fault condition whether It is having short circuit release like Low voltage circuit breaker or relay should be given?
is there any current and voltage drop on liquid resistance starter water/soda tank ?
plz send me Bhel, Mahagenco, sbi previous exam paper for electrical engineer on my email-id kambali_smita@yahoo.co.in