Why we should use delta connection in primary and star
connection in an distribution transformer, which converts
400v a.c. voltage to 33kv.
Answer Posted / swayanjit
WE USE DELTA CONNECTION AT PRIMARY AND STAR CONNECTION AT
SECONDARY IN CASE IF STEP UP OF VOLTAGE REQUIREMENT BECAUSE
IN DELTA/STAR TRANSFORMER THE OUT PUT VOLTAGE WILL BE 1.413
TIMES HIGHER THAN THE PHASE VOLTAGE EVEN WHEN BOTH HAVING
SAME NUMBER OF TURN. SO THE SECONDARY WILL REQUIRE LESS
INSULATION.
| Is This Answer Correct ? | 9 Yes | 9 No |
Post New Answer View All Answers
Connection diagram for KW meter and Kva meter
What is the fault or needs to be done when frequency in ac drives is not changing?
What is the meaning of dedicated earthing?
what is the differation bewreen kwh & fundamental kwh in electronic trivector meters
I want to know all basics of electrical engineering
placing earthing pit in pathway is correct or wrong??. placing earthing wireGI1/18 inside walls is correct or wrong?. explain!!!
If I want to lift the water at a height 50m from ground level through two inch(diameter) metal pipe then what is the capacity of motor pump is required? is it possible in single phase supply or not?
An 8 pole, 50 Hz, 3-phase IM is loaded to a poing where pull out torque will occur. The rotor resistance per phase is 0.3 ohm and motor stalls at 650 rpm. The slip when motor stalls is A 1 B 0 C 13.33% D 10.33%
what is the formula for hv test for cable and circuit breaker..????
what is level 2 automation?
how braking & making capacity of circuit breaker are calculated?
A 50Hz,4-pole,3-phase,star-connected synchronous motor has a synchronous reactance of 12ohmsper phase and negligible armature resistances.the excitation is such as to give an open-circuit voltage of 13.2kilovolt.the motor is connected to 115kilovolt, 50hertz supplying. what maximum load can be the motor torque,line current and power factor?
can anybody tell me that for p.f. Improvment we use capacitor banks but how to decide its capacitance. As we all know how to calculate kvar but what abt capacitance value
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?
how will calculate the safe starting current of 3-phase squirrel cage induction motor?