Answer Posted / jinchandramule
hi all,
Sap End user is nothing but the customer,
Try to understand his basic requirements,
Know the exact production pocess on which he is working,
Map those processes in simpler way and give him the
confidence and hands on experience with SAP System.
Tell him the importance of the system and how his work will
be reduced after implementing the SAP-PP Module.
Be specific about the current scenario he is facing ,work
on configuration to give him best solution and be frank to
tell if config not possible.
thanks
| Is This Answer Correct ? | 5 Yes | 0 No |
Post New Answer View All Answers
What is Backflush, the places where the backflush is used?
In cost controlling information system mention the fields that are listed in the list screen of the report?
Define ‘bom group’?
How to insert an inspection checkpoint at the end of an operation?
What is finite scheduling?
What is the transaction code to run MRP for sales order?
What is the role of an administrator in pa?
What is qualification deficiency? How will you come to know that a person does not have certain skills/qualification?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
What are the key fields in MRP views?
One component we can assign to workcenter at routing
What is the use of t-code cs20 in bom?
In sap-pp what are the costing parameters?
Which tool you are using
In project the customization is comes under which phase?