Do you have different BOMs for a material in different plants?
Answer Posted / jinchandramule
Yes,
we can have more than one BOM FOR A MATERIAL in Different
plants.
Depending on the plants reqts and the components
requirements,as well as the alternative requirements .
| Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
What are all the steps involved in Variant Configuration?
How you get the ticket?
Explain what is prt (production resource tools) in sap pp?
what do you mean by planning time fence
Mention how mrp (material requirement planning) types are classified?
What is qualification deficiency?
Difference between Item categories or what is variable size item or non stock item.
What is the standard info set?
How is the processing time calculated in a wc when both labor, machine categories exist?
How do you restrict the data to be entered in the payroll area?
Explain Planning file entry.
Where we have to specify the teardown time in one operation?
suppose we have sales order-40, PIR-25,warehouse stock-40, so when we run mrp,what quantity the system displays with MTO & MTS. How?
List out the basic procedure for dispatching operations in capacity leveling?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?