Do you have different BOMs for a material in different plants?
Answer Posted / jinchandramule
Yes,
we can have more than one BOM FOR A MATERIAL in Different
plants.
Depending on the plants reqts and the components
requirements,as well as the alternative requirements .
Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
What is the difference between pp and pp-pi? Which one is better and how ?
Explain the mrp list and their uses.
Integration between PP and MM Module.
What is a 'product hierarchy'?
What is meant by payscale structure?
Difference between different strategy groups.
Difference between standard cost and variable cost.
a company needs 12 standard values. how it can be maintained?
Define standard cost
Do you have any idea about Capacity Planning?
What is prt (production resource tools) in sap pp?
Explain Availability check.
What is finite scheduling?
You want to insert an inspection check point at the end of an operation. How would you do that?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP