Do you have different BOMs for a material in different plants?
Answer Posted / jinchandramule
Yes,
we can have more than one BOM FOR A MATERIAL in Different
plants.
Depending on the plants reqts and the components
requirements,as well as the alternative requirements .
| Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
What is standard order type
Do you have any idea about Capacity Planning?
Difference between plan cost, Actual cost and target cost.
Explain the stock requirement list and their uses.
What is Individual and collective requirements and differecne between them in MTO scenario?
Integration between PP and QM Module.
What parameters you maintain in “plant parameters” in configuration?
Explain the uses of the simple maintenance interface?
What is MTS and MTO and the difference between them?
Explain schedule margin key
What is the use of mrp list?
What does the use of ms70 followed by mcec get you?
In cost controlling information system mention the fields that are listed in the list screen of the report?
What are all the steps involved in Variant Configuration?