IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE
METHOD IS BEST?
I THINK WORKING STRESS METHOD IS BEST?
EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST
IS;1913SQ.MM
SAME TIME WORKING STRESS METHOD IS ;2213.
SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE
THEN LIMIT STATE METHOD?
MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
Answer Posted / britto/ram/saravanan
in WORKING STRESS METHOD,(for ex, if we want to use M20
grade in any place we will use M15 grade), that is minimise
the characteristic strength of the material, this is taken
when u r in designing stage.
in LIMIT STATE METHOD (for ex, we have design a member
takes 1 ton in this method we take 1.5 ton) in this method
we will take the actual charateristic strengtn of the
material.
| Is This Answer Correct ? | 15 Yes | 2 No |
Post New Answer View All Answers
What are the uses of layer?
very simple or less time consuming formula for reinforcement calculation by moment
how to caluclate sienerge qty in construction in ap
What is the name of this multiplication factors ?
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
i have boiler of 35 tone and wanted dig out foundation is there any body to help me to carry out calculation for the foundation like
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?
What is difference between engineering stress and true stress?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
What is the ideal size of the living room ranges from small to large size?
Aptitude, reasoning, quants, verbal and technical question
how to stop beam concrete between column
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?