Do you have different BOMs for a material in different plants?
Answer Posted / darshan dave
Yes we can have Different BOMs for a material in different
plants.
| Is This Answer Correct ? | 12 Yes | 2 No |
Post New Answer View All Answers
What are sequence, parallel, overlapping, splitting and where can we assign these
What is planning file entry
Explain how ‘pp’ is ‘integrated’ with other modules?
How do you integrate HR (employee) with PP?
Integration between PP and MM Module.
What is MRP Profile and MRP Group?
Explain what is the need of mrp list if the stock requirement list is already given?
Tell one biggest task for you
How can you create production order without routing and BoM?
What are the MRP master data?
How the processing time is calculated in a wc when both labor, machine categories exist?
What is phantom item & sub contracting
How to delete a group of products that was created in screen mc84 ?
Define mrp list
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?