if power factor comes in leading & showing -0.95. Is there
any effect on electrical system? if yes, then please tell me
what would be the effects. & how long we keep power factor
in leading.
Keeping power factor in leading shows more KW & less KVA is
it correct or not.
Answer Posted / rahamadulla.m
Yes there is effect on electrical system.The power will be
lost and could not maintain the voltage in the capacitor
bank system. so we can keeping power factor in leading
shows more KW and less KVA.It is correct.
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
if there is nutral in phase why we use earthing wire and grounding? even at fault condition the fault current flows to neutral (it is a lower path)
I have experienced electrical maintenance HT ,but I completed be ECE ....can I apply c license or not ???? Pls help me friend s...
draw a circuit diagram connecting transformer OLTC- RTCC- VCB-Marshalling Box otherwise Explain in words
TYPE'S OF BREKAR ,WHAT IS TRANSFORMAR & SAFTY. STARTER DOL & STAR DELTA STARTER.
132/6.6ππ πππππππππππ πππππππ πππ πππ πππππ πππ πππππππππ. πΈ'ππ πππππππ πππππππππππ ππ 6.6ππ/415π πππ πΈ πππππππ πππππππ ππ ππππ πππππ πππ ππ ππ 13/6.ππ πππππππππππ?? πΈπ π½π.. ππππ π ππ’??
why -48 volts dc used in telecommucation
how to copy from plc ge fanuc versamax series,all input and output, adress, and printout.
how diside ct mf exmp.200/5 ct
How impulse levels are calculated that for 11kV impulse is 75kvp, for 24kV impulse is 125kvp ?
While testing LA mast,What are the parameter limits ?
my UPS suddenly goes off and all panel light also blow off.This happens even main electric supply is not interrupted.After some time it automatically starts functioning normally.Batteries are new.
A 3 phase transformer's (Y-Y) Y and B phase is (Y and B connection not broken) broken from neutral and R and Nutral connection is ok, what will be the relay tripping and why
A 11KV, 1200 A breaker combination fixed in a cubicle for HT motor.Is normally for 11 KV motor fuse is using? if Yes, What range fuse is required?
what are the necessary basic electrical topics to learn for mechanical engineer to deal practical problems.
11 kV line deraction check by an Engineer.