When neutral is grounded in electrical circuit?
Answer Posted / gunasekaran
if it is source end it should be another one is
distribution end.
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
How to select batteries required for ups and the inverter if we Known load? And how AH is selected of battery?
How i can calculate current of cable according to ares?
What is ignition module of a CAT Gas Genset G-3508 Engine, Alternator SR4B Series. HOw its checked for correct functioning.Is it repiarable or replacable?
In motors how many types of cooling systems were used?
What types domain of laplace transforms? What behavior can laplace transform predict how the system work?
what is the minimum recommended leakage current of an earthed cable connected to the body or skid of an alternator
1)Explain why the cradle guard is used on railway crossing in overhead line construction?
I have 1500/1A CT If i connect this CT in 6.6KV bus bar means what will be the voltage present in CT?
Dear sir my name Ankit i m Diploma holder present working in Welspun Corp ltd Anjar as Asst.engg (salary 14400/month ctc) i Would like to change my company also i have selected in ford India pvt ltd Sanand as trainee Tech with salary 12000/month so please suggest me for changing my job hope for *ve response
I have a current transformer with 1 main reading meter with transformer outside the building and a control panel having 5 CT reading meters with black round coils inside the building. I want to know, A) when current pass through the Transformers, will the current be reduced or be the same and after that B) when current pass through the CT meters with black round coils, will the current be reduced or be the same. C) in the above process will the reading of the main meter be same or different, from the total reading of all the 5 CT meters.
Why we use ups battery and dsdb battery in thermal power plant
what will be d.g. capacity to cater together for 14hp A.C. load & 3kw lighting load
i m electrical diploma holder i want to do plc $ Scada some body tell me which insitute is best for me near chandigarh
When calculation of fault current and fault Kva is to be done,why always we use per unit value and why we consider the base kva?
How to design a Unit auxiliary transformer for a power house having a unit of 65 MW and Generating voltage of 11 KV and Secondary voltage of 433V