if user calls and reports to you that his background job is
taking long time, and which normally does not take so much
time. What will you do?
Answer Posted / sanjay
there could be lots of reason for long running BG job.
1. check with the job owner what the report contains,
long critical programs might uses long run time,
2. Did this job runs for the first time or runned previous.
if previous then what was the time taken past.
3. check for the real status of the job, might be some
situations the job completed/cancelled but due to
communication problem the status might not be updated in
SM37.
4. check for the memory utilisation, and resource constrains
it is only the job owner who knows what is the jobs and
what is it doing or what purpose the job has runned.
so take help and work with the job owner.
| Is This Answer Correct ? | 22 Yes | 1 No |
Post New Answer View All Answers
If a background job runs more than the time it should be completed normally then what actions will u take?
Explain the system trace?
what post steps and pre steps db refresh
How you connect ECC to EP?
steps to congigure CMS in XI ?
What is the difference between central instance & application server?
How to create RFC CONNECTION between production server and Global trade system. what prerequsite we need for this.
How you can disable the ‘import all’ button on stms for the queues?
Suppose you have to integrate sap ecc 6.0 to aws cloud. How can you achieve this?
Can any one tell me , what is the role of SAP Security Admin in BW Security and APO Security ?
Mention the use of personalized tab and parameter tab in user master record?
What is the different type of users in sap?
does the Tcode EWZ5 exist in ECC6?I'm using NW2004S SR2 abap engine and EWZ5 doesn't exist in that.so in that case what is the alternative to EWZ5?to see the list of users present in a client but not necessarily logged in and to to lock or unlock them? Thanks.
list some common errors faced with jspm while updating java stcks.and solutions.
what are the main issues you faced in the implementation project?