Answer Posted / pankaj kumar verma
Infinite busbar is a whose parameters like voltage,
frequency and phase sequence remain constanat even change
in the connected load to the infinite busbar.
| Is This Answer Correct ? | 21 Yes | 6 No |
Post New Answer View All Answers
for 11KV OH system what will be typical per KM "R" "L" "C" parameter. for 33KV OH system what will be typical per KM "R" "L" "C" parameter. for 33KV UG system what will be typical per KM "R" "L" "C" parameter.
In Power Line Communication (PLC) the wave trap is used to block communication signals from entering neighboring lines. My question is this: Why do they allow for different filtering arrangements on these wave traps? Isn't it always going to be a low pass filter since we want the power frequency to go through, and the comm signal blocked?
what is the meaning of 5% droop or 7% droop in AVR?
what is protection class current transformer.
at which voltage level arcing ground is occurs ??????????
pls tell me about ups internal connection & we have given only 3 phase supply to ups system how get 4 wire (R Y B N )
electrical ques
Difference between control junction box (cjb) and power junction box(pjb)?
what is smart grid? why we use it? explain in detals bcoz i want give presentatin from it....
specify the inbuilt protections in DG
Draw the single line diagram of the power station?
how you taken aotitude test
(1)The demand for electricity , the amount of renewable generation available, the amount of fossil fuel generation available and the cost of the fossil fuel generation are shown in table below period(hrs) demand(MW) renewable (MW) fossil- fuel(MW) cost of fossil fuel(MW) 00.00 - 01.00 2000 1800 2000 30 01.00 - 02.00 2300 2500 2000 30 02.00 - 03.00 2500 2700 2100 45 03.00 - 04.00 2900 3100 2100 50 04.00 - 05.00 2700 2600 2500 45 05.00 - 06.00 2400 2000 2700 50 06.00 - 07.00 2200 1800 2000 36 07.00 - 08.00 2100 1600 2000 36 Assuming that the renewable generation incurs zero cost, determine an optimal generation schedule(specifying the amount of renewable generation and fossil fuel generation used in each period, the cost for each period and the overall cost for 8 hours.)
Why compensation is necessary in feedback control system?
After taking shutdown of 11kv feeder, if you see 5kv by phasing stick in the cable side, is it possible to close earth switch in cable.