Can we operate a DG Set in paralell with Transformer ?
Answer Posted / ekanadam naik
yes we ca operate dg set with transfer but voltage and
freqency must be matched, with help of PLC,
Is This Answer Correct ? | 20 Yes | 3 No |
Post New Answer View All Answers
Explain in brief description about the operation of DG sets.
why moisture formation found in XLPE Armoured cable outer sheath
my name is venkat .i have good percentage in my academics(ssc 86, intermediate 83 b.tech 73) my question 1..after completion of my ssc i joined in bpc but i didnt got rank in emcet so i completed MPC in one year compartmentally ..so here what am expect question from this background?
what is the difference between electrical choke and electronic choke?
what is the pulse and audio frequency transformer? what is different between induction regulators and tap changing transformer?
what are your career plans upon completion of the programme and the relevance of recity generation to your professional development?
how to select the no. of brushes in a lap winding?
WHAT IS AIR GAP VALUE IN MM FOR A 11KV BUSHING OF 11KV/440V DISTRIBUTION TRANSFORMER. AND AIR GAP VALUE OF 25 KV BUSHING OF AT TRANSFORMER OF 25 KV TRACTION. WHAT IS THE CALCULATION FOR THE AIR GAP PERMITTED FOR BUSHINGS AT DIFFERENT VOLTAGES.
wHAT IS CAPACITANCE LATCHING? hOW TO CALCULATE CAPACITANCE LATCHING? hOW TO SOLVE THE PROBLEM IF CAPACITANCE LATCHING APPLIED?
What is the reason behind current flow(20 A) in amain earth cable of an SMDB? Is cuurent flow(45A etc) through a neutral cable acceptable?
Operation carried out in thermal power stations?
what happens in the short circuited secondary transformer,if the resistance of the short circuit is increased gradually?
A 100KVA SINGLE PHASE TRANSFORMER 10000/200V,50HZ REQUIRES 300V AT HV SIDE TO CIRCULATE FULL LOAD CURRENT WITH LV SHORT CIRCUITED.THE INTAKE IS 1000W.THE % OF REGULATION ON FULL LOAD AT 0.8 PF LAGGING WILL BE HOW MUCH AND THE SECONDARY TERMINAL VOLTAGE ON 0.8 PF LEADING WILL BE
what exactly commisioning work does in electrical site work... LT side?..
33kv substation lay out details & line to line & line to earth measurements