IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE
METHOD IS BEST?
I THINK WORKING STRESS METHOD IS BEST?
EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST
IS;1913SQ.MM
SAME TIME WORKING STRESS METHOD IS ;2213.
SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE
THEN LIMIT STATE METHOD?
MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
Answer Posted / bond
U know nothig about civil engineering. go and study first
before putting such stupid questions..
| Is This Answer Correct ? | 14 Yes | 22 No |
Post New Answer View All Answers
How many feet are in 4 square yards?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
what is tension & compression of steel bending.
How much cement is require in one sqft area in a G+3 residential construction.
pls mail some more tecnical qustions at msaranya2610@gmail.com
how to calculate MR 9(derivation)
give me the rate analysis for Bituminous Macadam and SDBC
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
What is the snap size in civil and how can we create it?
pls give me some basic informations in construction of a structure?
Define What is the distance between railway tracks?
Define graphics window?
How many types of slabs are there & how to design it?
Which is the best book for building construction?
What is the material consumption- cement,sand,tiles etc for Toilet dado?