Answer Posted / shailesh
WHENEVER THE BOM COMPONENT IS THE SAME MATERIAL AS THE BOM
HEADER MATERIAL, THEN THE BOM IS CALLED AS RECURSIVE
BOM.THIS TYPE OF BOM IS FOUND IN PROCESS INDUSTRY WHERE A
SAME CHEMICAL CAN BE PREPARED FROM SMALLER QTY OF SAME
CHEMICAL.
Is This Answer Correct ? | 39 Yes | 1 No |
Post New Answer View All Answers
What is plm (product lifecycle management) in sap pp and what is the use?
Can any body explain me why work scheduling view is required for semi finished and finished products?
Explain In-process inspection.
What are basic dates?
Can't one material be assigned to more than one operation in a routing, why?
Different types of consumption based planning.
What is golive actually? What is the role of a functional consultant in golive actually?
Explain variant configuration
Difference between PP and PI.
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
What is MRP Area or How can I excluede one storage location stock from MRP?
Explain what is “work center” in sap pp and what is the use of data in work centers?
How to delete a group of products that was created in screen mc84 ?
List out the basic procedure for dispatching operations in capacity leveling?
Difference between plan cost, Actual cost and target cost.