Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

when we given 3 phase supply to ups system, but out put
comes with 3 phase + neutral how it possible? pls explain.

Answer Posted / vinaysuper2000

UPS Incoming supply Delta connection & Out put supply star
connection.

Is This Answer Correct ?    9 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What happens when ac supply is given as excitation voltage instead of dc supply

3694


What are the specifications for conducting earth leakage test as per IEC standard?

1994


apti mainly on logical reasoning, verbal and non-verbal ability (70 percent) and remaining technical. I was in ee but technical had mech ques like on turbines and welding.

2129


When we have earthing mesh or underground earthing network in industrial plants, weather we have NT-S or NT-C-S kind of earthing system, so eventually weather we must use 4 or 5 wire in 400 volt level (For example 3×150+70 mm2 or 5×150 mm2) in this connection I would like to know exactly the paragraph of IEC or IEEE number

2100


Can Anyone Answer anyone of these ? Q1) why direct SOLUTION of Load Flow Studies in Not Possile ? Q2)Why majority of Buses in power system are load buses Q3)Why one of the buses in Power system is taken as reference bus (slack or swing) Bus ? Q4)Bus Admittance Matrix is a sparce (means it contains some zero elements ) matrix , give reason

1847


As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?

1726


Dear sir, my knowledge about cable size determination is limited. Though I read examples I could not calculate the Cable size required for electric driven pump 40 KW, 380 Volt, 50 HZ, 50 meter from transformer and it is three phase star delta starting. Please help as there is no one in my surroundings to help.

1700


How to calculate cable size by using load.?? Any formula...

1311


I am apply the AAI. So i want electrical sample question paper in technical with answer my id is vijayjobsmart@gmail.com

2631


what is the internal working of star delta starter

2055


What is the function of the generator exciter?

1352


what is cathodic protaction?

1943


What is genrally the % Impedance of a Dg set? How can we calculate Earthing conductor size for a DG set?

3960


why the NGR (neutral grounding resistor) always OFF during DG off?

3424


Draw the single line diagram of the power station?

1021