Answer Posted / lakshitha
1.5 Cement powder portland
| Is This Answer Correct ? | 10 Yes | 18 No |
Post New Answer View All Answers
How do we calculate absolute pressure?
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
VAT and CST ? Which benefits for buyer ? Why benefits?
How to use of me trial wall plaster 6mm , 10mm par sqm. use in sand and cement ?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
how much cement and sand consuptin in 4 inch siporex walls 100 sq ft
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
what is that one cub metre plaster in cemant and fine sand
how to caluclate sienerge qty in construction in ap
What is the meaning of a blue land surveyors flag?
how to calculate 1:5:8 ratio concrete cement, sand, metal and water please give me brief calculation
what is moment-curvature relationship in semi rigid connections??
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
Which IS Code/American Code applied for coupler test of steel
what is stressing