how to design an isolated footing having load and moment
acting on the column also draw pressure diagram at the base
Answer Posted / s.prabhakar
my id (s.prabhakar_5@yahoo.com) pls send the ans sir.
Is This Answer Correct ? | 1 Yes | 3 No |
Post New Answer View All Answers
What is the purpose of Chipping in the heavy foundation?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?
how to workable concrete cube test M-25 design mix
Labor requirement for each item needed? Lean Concrete 103.550m3 Concrete for Foundation and Structure 1753.000m3 Expansion joint 288.000m Contraction joint 127.000m Dowel bar 450.000m
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters
what is the meaning of degreasing of the euipment or line.
how to calculate the steel in 500yard
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
for 32 dia (EQR HYSD steel) bar how much deduction for 45 and 90 degree band
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
VAT and CST ? Which benefits for buyer ? Why benefits?
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm