Answer Posted / alok
The main concept of recurssive BOM is that When Material BOM
is also used as cmponent that is called a recurcive BOM.
The Best example is Curd.
Alok
Pepsico
Is This Answer Correct ? | 9 Yes | 2 No |
Post New Answer View All Answers
What is the data you give in S.O.P screen?
Integration between PP and PM module.
what is std info set? where it is used?
Mention what are the t-codes for creating, changing and summarizing bom?
How many levels of Flexible Planning are there?
What are the steps of production execution process?
What is the use of t-code cs20 in bom?
Where we have to specify the teardown time in one operation?
What are all the settings done for configuring the integration of pp with fico?
Mention what is the purpose of using capacity planning?
Explain 'mrp' (material requirements planning)?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
Explain the process of Material costing.
What is meant by payscale structure? How did you configure payscale structure?
What is activity type and how it works in costing?