if wt of steel is to calcullated then
steel=(d*d)/162
if area of steel is to be calcullated then
Ast=((0.5fck*b*d)/fy)*((((4.6Mu*10^6)/fck*b*d*d)))
| Is This Answer Correct ? | 15 Yes | 5 No |
Post New Answer View All Answers
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
how to shuttering is used in slab
what is mc arther pile?
What is the exception critarea of cube?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
What is meant by scaffolding coefficient?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Basic civil interview questionsÂ
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
what does the grad of cement shows (denotes)?
Is there the dry coefficient of cement is constant?
What is meant by Crystal Concrete?
Explain what is structural frames or systems?
What are the responsibilities of a construction manager?