Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

whats the field test of cement,aggregate and water

Answer Posted / sachin

cement:- colour of cement should be greenish gray, it
should have no slumps, it should flot 4 some time when
sprinkelled on stell water, when hands are put inside the
cement hands should get the sence of collness.

aggregates:-coarse aggreagets when sieved should retained
on 4.75 mm sieve and it shouild get pass on 8mm sieve.
fine aggregates should pass through 4.75 mm sieve, if taken
in hands and hands are clossed cumps should not be formed.

water:- i dont think there is any field test 4 water. but
as far as possible it should be clean.

Is This Answer Correct ?    15 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how i can tak Quantity of mortar in block work

2397


For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate

1595


Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)

2265


What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??

2364


how to calculate mivan shuttering matrial

1586


How to calculate the quantity of ingredients of M20 grade concrete?

1991


What is the difference between built area and super built up area?

1253


in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh

2272


Curvature ki quantity kaise nikalte hai pls give me ans... curvature canal ka hai

3071


Explain what is alternate bid?

1276


Explain what are the problems one might face while having a Cantilever balcony?

1336


what is a well

1976


What is bylayer?

1159


WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.

2031


How can I make justification between using concrete grade c35 compare c37?

1588