Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is mean by ITP in a construction project

Answer Posted / s.srinivas

Inspection and Testing Plan

Is This Answer Correct ?    99 Yes 4 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Concrete cover for slab, column, beam and footing?

1165


in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft

2182


How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction

3153


how many shuttering material required for 1000 sq.m built up area.

2437


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

2369


Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.

3022


how to caliculate required amount of cement and sand required for 1cu.m.

2271


What ingredients with% found in ppc cement??

2189


Define mirror?

1322


In cement making,what is meaning of blend,fineness,density. 

3568


rimmer in pile foundation

2965


Who name us Engineer & Why?

2573


how pumping of concrete effects the quantity of material used in it?

1761


explain the advantages of total stasion

2242


A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx

1868