Answer Posted / s.srinivas
Inspection and Testing Plan
| Is This Answer Correct ? | 99 Yes | 4 No |
Post New Answer View All Answers
Concrete cover for slab, column, beam and footing?
in one hour , one 200 excavator , how much quantity (mcube)can load ? soil is not hard not soft
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
how many shuttering material required for 1000 sq.m built up area.
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
how to caliculate required amount of cement and sand required for 1cu.m.
What ingredients with% found in ppc cement??
Define mirror?
In cement making,what is meaning of blend,fineness,density.
rimmer in pile foundation
Who name us Engineer & Why?
how pumping of concrete effects the quantity of material used in it?
explain the advantages of total stasion
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx