How to calculate lap,bond and hook length for preparing bar
Bending schedule ?
Answer Posted / arun sangwan
To calculate the lap length-48*D
For calculating hook & bend -As per Is 2502,The anchorage value of the of bend shall be taken as 4*D of the bar for each 45 Degree bend and for the U type hook its always taken as 16* D.
For the bond length(Development Length)-Ld-It is calculated by the formula. and it includes all the values of the anchorages.
Is This Answer Correct ? | 317 Yes | 77 No |
Post New Answer View All Answers
How do you convert wind speed into force?
WHAT DLC DESIGN IN CONSTRUCTION
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
construction workers how much time take one work or qty
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
How can i do RCC rate analysis?
what are the duties of Site Engineer in work site?
What is M40 _ TOR - EQ and B.F.S
how to calculate total cost for slab 35'×8'
detailed calculation of the amount of cement used?
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
Is it possible to make a feature using an overdefined sketch?
what is the specific gravity of rubble in plum concert
for pretensioning which will yield first and same for post tensioning?