Answer Posted / raviunique2@gmail.com
plc installing is done through via codings it means plc is
nothing but the device and combination of software and
hardware codings means the normal c program is installed in
hardware according to their requirements ..........
Is This Answer Correct ? | 1 Yes | 15 No |
Post New Answer View All Answers
Explain the difference between plc and cnc?
SOME OF YOUR QUESTIONS ARE NOT MAKING ANY SENSE SO TRY AND PUT IN A LITTLE BIT MORE EFFORT BEFORE YOU POST A QUESTION. WE WILL ONLY HELP THOSE WHO WE CAN SEE ARE TRYING TO HELP THEMSELVES.
what do u mean by compensation n pid tunning?in pid tunning what you tunned?is it possible 2 tune p i d
when the instrument tapping on pipe line is located below and transmitter is located above the tapping point for liquid service transmitter, what should we do, is there any additional drain valve is required??
the 3 most common transmitter protocol being in refinery or qatar gas and aramco.
How to erection of DCS Panel at site step by step
What is the purpose of the analyzer in petrochemical plant?
Where Can i take a SPI INtools training in Mumbai? In Rolta India Ltd to whom I should approach regarding of SPI INtools Training?
What is motion balance principle?
What happen if we install my pressure transmitter below the elevation of pipe in natural gas service?
Basically iam Instruemntation Engineer, but Iam interested in Instruments design engineering, so plz guide, is there any course, training or Softwres to become Instrument design engineer??.
In which principles tx ,pressure gauge,Temp gauge,control valve works?
Exothermic reaction./ endothermic reaction
can we copy the software from a transmitter using hht(hart 275) ?
How many interlocks at turbine side?