can u guys tell me why we are using sheild in junction bos
wiring ~! ?
Answer Posted / rajkumar
Shield wire is to eliminate the noise pickup in the signal
wire due to magnetic interference from the near by
source
Panel or JB side shield to be earthed but Instrument side
no need to do earth (cut the shield and tape).
| Is This Answer Correct ? | 14 Yes | 0 No |
Post New Answer View All Answers
we are having yokogawa centum cs3000 dcs in our power plant. i need some of the operator guides NOT to appear in HIS0163 AND HIS 0162 but it shoul appear in HIS0164 HOW TO DO IT?
Displace type LT to be calibrated in workshop, wt. 40, dia- 60 mm, density- 0.8kg/cm3.
For what reason would you possibly be compelled to make use of a Smith Predictor. Explain the idea behind the operation of this device.
how to calculate orifice sizing? and tell me if pipe size bet 50mm t0 200mm then we can use pipe flange??? and above 250mm pipe size should i use D & D/2 Flange? is it right or wrong?
what are the steps I have to deal with?
Yokogawa CENTUMVP R6.09 unable to download to Engineering Station with ExaOPC R3.75
The issue is when I try to download the common project section to the Engineering Station (STN) from the HIS in System View, it is unable to connect. The error displayed is:
WARNING: Could not connect to equalize destination. (7001)
Retrying. Number of retries = 0/1
ERROR: LdXopsLoadMain: connect error 10060
ERROR: Processing terminated due to connection error. (7002)
Equalization end with errors. STN0149
---- ERROR = 2 WARNING = 1 ----
Background:
>Updated the ExaOPC software on the STN from 3.60 to 3.75
>STN operating system is Windows Server 2008 R2
>HIS operating system is Windows Server 2016 Stanard
Solutions attempted include:
>Ensuring all IP addresses are correct and all networked devices can be pinged.
>The ability to ping a device using its host name from another device (
send me last 5 years questions asked in rrb chennai, for section engineer
how can leve transmetter calibate in feild .and also put cv and flow plz .....
what are the values of fuel flow rate in various places in boiler.
Why does a pressure gauge installed on reactor, doesn't have any vent line below to release the pressure? Is it any kind of designing mistake or it actually does not require any vent line? And if it does not require any vent line below it then how we are gonna release the pressure built inside the pressure gauge?
How oil line flow measured?eplain about instruments used and working principle?
please tell no. & add. of consultancy who recruit me in power plant as instrumen engg. present i m working in power plant as ass.t instrument engg. thanku mahesh 09226562826
Can any body tell me about SAP MAINTINANCE MODULE. WHAT IS its function and application. And study material Source about it. I shall be very thankful.
Explain PID, ON/OFF, Controls
what happen if i increase height of displacer type LT.accuracy or sensitivity are affected.why?