Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

can we use light duty vehicle axle into the heavy duty
machinery axle ? if no then why?

Answer Posted / atul tiwari

no, we can't use light duty vehicle's axle into the heavy duty machinery as it is designed to transmit lower torque to the wheels and hence it will not be able to sustain high torque of the heavy vehicle.

Is This Answer Correct ?    5 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

junior engineeer (railway previous questions)

1840


What is the gas constant r for air?

1091


Explain how is natural gas better than lpg?

1047


Where pneumatic system is used?

987


What are the causes of troubles in boiler during operations?

1893


Sir i am appearing for the section engineer post examination of railway recruitment board.Can you please send me the previous question papers from 2001 to till date.

1996


Why you consider yourself suitable for the post

2917


plz send me the aptitude test paper for hpcl.

1952


How cooling Tower height selected

2545


What the function of bye pass filter in DG.

1711


Dear all, Will some one help me in this issue please? We are entering the Zero Stock Component in Maintenance Order, and we make a Check when the order creator is going to release system will appear Error, until he will not delete that zero stock components from the Maintenance order. but right now what the order creator is not releasing the order but he is going to save order, when's he save the order without release system will generate Reservation in the back ground, which should not happen for Zero Stock Components ? I need the way which we are doing in MB21, Reservation creation by thru Cost Center / WBS Element. At present if you run MB21 and you are going to issue the material system will not allow to generate the reservation if there are zero stock components in the list. please guide me for this issue ? Note : Simple what I need is I don't want to create any reservation thru maintenance order for the Zero Stock Components. Regards, Abdul Mujeeb

1774


what is cyclon vibration effect in turbine

1994


Can some one please show me the design of a POT Bearing.

2544


I am much interested to join airforce but I heard that this is not so good for girls .please give ur views that what should I should do

2329


What is the purpose of bilge separator

1803