what,s the clear cover of beam,slab,column,lintel and
foundation?
Answer Posted / durairajan
clear cover beam is 30mm and slab is 20mm and column is
40mm and lintel is 15mm
| Is This Answer Correct ? | 102 Yes | 100 No |
Post New Answer View All Answers
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
why +1 to be followed for calculating the no of bars in BBS. Please explain
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
what is that one cub metre plaster in cemant and fine sand
why building got air crack? if it get in one particular are what is means?
cause of cylinder test failure
can i get hindi version of is codes based on civil engineering?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
Exterior Joints,define
What is modular elasticity?
How to find the cuplock pipe qty in staging for Minor bridge?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
can i make bricks using M10 grade concrete ? and what would be the cost of a brick if we use m10 grade concrete sand and aggregates ??
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.