What is availability check? How can it be done?
Answer Posted / jinchandra
It is ATP CHECK,
WHICH IS CARRIED OUT FOR FOLLOWING,
1]MATERIAL
2]CAPACITY
3]PRT
It check the material available in warehouse stock,to
fulfill the planned indpendant requirements.
if not,it checks the missing parts,and evaluates,
Similarly it checks the capacity available.
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
What is processing class, where we do them and why?
Standard mrp steps
What is end user training
a company needs 12 standard values. how it can be maintained?
Explain LTP.
what is alternative item group
Where we have to specify the teardown time in one operation?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is the use of mrp list?
Are there any reports in sap to list of material requirement from ltp ?
SPRO path for order, confirmation or requirement class.
Which BOM item category you have used?
What are the ‘bom categories’ supported by sap?