Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

give me the mix proportion for design mix concrete M10 grade
1:4:8

Answer Posted / raju

what does it mean 1:3:6
is it cement:concret:sand

Is This Answer Correct ?    48 Yes 145 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the purpose of the gap in the road on this bridge?

1304


Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings

2137


How much material is required for constructing a 2 Lane 2Km rigid pavement road

2183


I am called for interview from north east power plant .so, I need some interview question which may help me.

1784


in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?

2305


Hi I had missed my mark list (first year-apr2003)how i search in my old mark details in internet and which web site? pl inform me in full details..

1946


Define What is the best type of wood glue?

1151


WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)

3709


how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high

1903


how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .

2728


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2085


how to conversation of all construction material in to brass

5475


Define What is the force exerted by the Tacoma narrows bridge?

1148


What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?

2718


How to do rate analysis for concrete work including shuttering work?

2043