Answer Posted / y.rama krishna
Connect 1U&2U
Apply 3ph 415V balanced voltage across terminals 1U,1V,1W
(HV wdg)
Measure the voltages between the given terminals & record
1)1U-1V
2)1V-1W
3)1W-1V
4)1V-2V
5)1V-2W
6)1W-2V
7)1W-2W
8)1U-2N
9)1V-2N
Verify the conditions
a)1W-2W = 1W-2V
b)1V-2W = 1V-2V
c)1U-1V = (1U-2N)+(1V-2N)
vector group Dyn1 confirmed if the above conditions are
satisfied.
| Is This Answer Correct ? | 18 Yes | 16 No |
Post New Answer View All Answers
Why hydropower is called renewable source of energy?
Please tell me in DETAIL about the following 3 types of fuses or recommend me a good power system protection book or a website link ? 1.Dropout Fuse 2.Striker Fuse 3.Empulsive fuse (not sure if its impulsive or explosion fuse , sorry)
What is core CT & it's function?
why +24 v and -48 v give to BTS? If -48v protect from surge then why we not use -24 v?
HOW TO CALCULATE HV TEST VOLTAGE FOR ELECTRICAL EQPT.
What are dependent sources?
In the magnetic fluxes, what is the role of armature reaction?
why in the three pin plug all 3 pins are cutted ?
What is meant by time harmonics and space harmonics?
What is frantic effect?
What are the advantages of thermal power plant?
Explain how you intend to work under pressure to meet up with deadline target?
why the arc welding machines require parallel earthing systems? ie why each machines are connected to earth pit by separate wires during earthing? wats it adavantages?
According to IEC60034-14, When the vibration monitoring system required for motor Bearing. above which KW, it is required? and for what type of bearing the vibration probe is provided.
sir please send me techinical questions for junior engineer posting in bangalore railway i am diploma holder