HOW THE ORIFICE & PRV SIZING BE HAPPENED -- EXPLAIN IN BRIEF
Answer Posted / ankit
0.68 x d where d= dia. of pipe
| Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
what is installation and commissioning of (fat & sat) of power plant dcs ? this question keeps in desirable conditions of one company .
what is the difference between profibus and controlnet networking.
Explain PID controller tuning & any one method used for it.
Question on maha cement
How can i test procedure grounding for CAT-7 cable? Or How can we test procedure CAT-7 Cable Electrically safe?
for oil & gas industries which zone is normally preferred? why? give its example?
how u choose thermowell lenght n pnumatic C/v size?
what is dc moter.
What are the key features of a Distributed Control System? describing the various layers (sensor through to business system interfaces) as well as the hardware, software and security aspects of the DCS.
What is the use of double seated valve?
Any body have know try work calculation ???
I want to apply for the universities in US,but i got the GRE score of (650+300=950)TOEFL 69/120.Is this score sufficient for applying universities please i am married i need to go to US because my husband didn't get H1 yet.please send me suggestion
Hi Friends i am going to write BARC written test by this month 20th (20-5-2008). So please if any body knows the details about this or having previous question papers pls mail me to kkumarei@gmail.com. For Suggestions give one message to 9962122264
can you send remote seal interface level transmitter calculation steps for oil water saperator.
what is temperature compensation?