If at site iam supposed to get M30.But by mistake i got M20
mix. How could I differentiate the mix before placing?
Answer Posted / vejeydeepak
fiends iam trying to solve if it correct reply me
take a container put 0.1 cu.m of concrete add some water in
it slowly try to drain out water separate sand and aggregate
weight it covert the obtained weight to 1 cu.m you come to
know the mix is m30 or m20
| Is This Answer Correct ? | 8 Yes | 23 No |
Post New Answer View All Answers
Formula for calculation volume of essentric footing
Which condition will prevail for the design of a swimming pool ? When the pool is empty or when it is filled ?
What are the reasons for geotechnical site investigations in uganda?
undistributed samples are obtained by
Why does the pressure increase under soil?
procedure for preliminary selection of size of column of 5 storey building
is concealed wiring a problem in fly ash brick wall?
what is that one cub metre plaster in cemant and fine sand
What is the difference between EPC,DBOOT and BOOT.
give me the rate analysis for Bituminous Macadam and SDBC
In a concrete grade C35A, C & A stands for what and equalent cube strength?
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
can you give me the details of rate analysis of steel and concrete?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
What are the different types of foundation?