WHAT IS THE THUMBRULE FOR FINDING OUT THE CURRENT CAPICITY
OF A COPPER WIRE?? 2.5, 4, 6MM SQUARE ETC...
Answer Posted / uttam dutta
cURRENT CARRYING CAPACITY NOT ONLY DEPENDS ON THE CROSS
SECTION OF THE COPPER WIRE, IT ALSO GREATLY DEPENDS UPON
THE TYPE AND THICKNESS OF THE INSULATION, ONE MORE FACTOR
IS CORE OF THE CABLE, IE SINGLE CORE OR MULTICORE.
cONSIDERING ALL THIS FATORS STRICTLY IT CAN BE SAID 1 SQ.
MM COPPER CABLE CAN BEAR MAX.11 AMP SAFELY CONTENIOULY AND
2.R CAN BEAR 19 AMP . 4 SQ MM CAN BEAR 26 AMP. SOME TIME
THIS MAY VARY LITTLE DEPENDING UPON MAKE.
Is This Answer Correct ? | 7 Yes | 4 No |
Post New Answer View All Answers
To prove the capacity of a 10MVA transforemr with 6.5% impedance by a short circuit test how much power is needed to inject an impedance voltage if we have to arrive for its rated current?
How to work definite,over pluxing,revers power,OSR relay
what does vector group Dyn11 tell us? also tell me how will u differentiate between phase lead and phase lag thru this vector group
Determine the BTU size of an aircon for 20 sq metre room
1.why are not using acb 33kv ht side? is there any problem 2.what is difference between acb,vcb,sf6 breackers? 3.what is the function of invertor and convertor in ups?
A 3-PHASE TRANSFORMER IS USED TO STEP-DOWN THE VOLTAGE OF A 3-PHASE, 11KV FEEDER LINE. PER-PHASE TURNS RATIO IS 12.FOR A PRIMARY LINE CURRENT OF 20A, CALCULATE THE SECOUNDRY LINE VOLTAGE, LINE CURRENT AND OUTPUT KVA FOR FOLLOWING.A)STAR- DELTA.B)DELTA-DELTA.
How will be the single line diagram of series trip HT breaker? how it works?
what is consequences of neutral and earth connect?
could you measure current in parallel?
i've iocl interview.. if you know the interview process please give me information..
explain all the classes with example
What happens if we run alternator on under frequency?
ROC converges if pole and zero lies inside a) origin b) z=1 c) pole d) zero ? Explanation please? if ROC does not converges then?
if an insulated power and control cables of a running gas diesel gensets laid direct in an open trench i.e, trench bed is not rcc of a power house in which rain water, spillage water alwas exists and all power control cables remains submerged even when gas gensets of 480 kw each runningin on load. These power &control cables runs from power house to switchgear room through these trenches in which water remains most of the time. pl explain its merit & de-merit
how much maximum load a 2 core (Single phase) 16mm aluminium wire can take ?