Answer Posted / karanth.sp
The PF of the connected load to a particular transformer is
to be asssuemed or known exactly.If the transformer is
already loaded you can kow the running PF by PF meter
connected.IF the PF is say 0.7 & you want to improve to
unity.You must add a capacitor of Total load in KW multiply
by a factor of 1.02.That is the value of Capacitor in KVAR.
Formula is PF (cos0)=0.7 Tan01=0.963
improve PF(Cos0)=1 Tan02=0
KVAR Required= P(Tan01-Tan02)=P(0.963).
This shall be devided in to number of stages as required.
| Is This Answer Correct ? | 9 Yes | 5 No |
Post New Answer View All Answers
What is the technical difference between On delay timer and a Star delta timer?
Please explain the following and how these are working with PLC unit 1.I/O Module 2.I/O Device 3.Adaptor Card 4.Ribbon Adaptor 5.RS 485-FC
Difference between earthing & grounding.?
Hi, Next week Iam appearing RRB exam for section engineer. So help me to get modal question papers for this position. Iam very thankful to you. Whether question will be fully techanical format or general form. Please give me a details regarding this exam.
For overhead protection we use which transformer?
What is the lifetime of a Thyristor? Is there a recommended lifetime for thyristors after which they should be replaced?
Dear sir, iam completed iti ncvt electrician 2000-2002 & diploma electrical eng completed 2008-2010 distance education in rvd university, still i got B licences only but my working company want C licences, how to i get c licencese pls reply me iam in critical situation thank you karthick 9841637803
HOW TO CALCULATE THE REGULATION OF 100 AND 25 KVA TRANSFORMER
How harmonic block test are conducted on relays ( Siemens,Areva ect )power transformer using omicron kit?
give me applications of sequence bridges . (used in 3 phase un balanced systems)
why the neutral point in connnection oscillates?
what is the size of cable for 15kw motor and 85 meter cable length using with vfd
Write down the brushes of a de machine.
If we have to feed a housing complex having load 8MVA, than what would be the better option, either we first step down 33kv supply into 11kv & than 430v or we proposed no of 33/.44 kv transformer, also which option is economical?
why co incidence factor considered in transformer sizing?