Calculate the system connected load.(CL)
Rating of Transformer = (CL*U.F.*M.F.)/(Tran.Effi.*p.f.)
Then consider the loading factor as 80%
as U.F. -Utilisation fsctor & M.F.- Maintenance factor
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
we have consol make 3 phase servo stabilizer for cnc m/c. while installing the earth neutral voltage is 1.7 volts at stbilizer off condition and when stabilizer get on en voltage reaches 4.8 volts (new earthing is done and neutral is helthy condition all phase to neutral volts 440,442,441 v)why this happen.solution for cause.
L.A. (Lightening Arrester) is located at a place from where transmission line enters the transmitting substation. So L.A. (Lightening Arrester) is the first equipments which has to encounter with lightening, high voltage surges and switching surges. It has to absorb energy of lightening, high voltage surges, and switching surges. L.A. (Lightening Arrester) is made up of layers of semiconductors. If these layers can not tolerate energy released by lightening, high voltage surges, and switching surges the L.A. (Lightening Arrester) blasts.
completed BE & done apprentice at tneb & having experience 6 years. want to get c license. will apprentiship & BE be helpful for getting c license. will i get any preference by showing this?
is there any lightning by passer is arranged in ship like buildings?
reason of diode failure in alternator
WHAT IS THE FUNCTION OF SHORT CIRCUIT MAINTENANCE CT
Air circuit breaker safety
can we use engine degreaser for electrical motors?
WHAT IS THE DIFFERENCE BETWEEN AN ACB & mccb 7 WHAT IS THE CRITERIA WHEN TO USE WHICH OF THE TWO
what kvrah y we need to take the readind of that
How do we find the rating of a transformer, if it got burnt badly.
how to calculate the surge level of surge suppressors related to the SF6 cicuit breakers?
what is gas turbine intercooling ?
What is meant by stator? What is meant by rotor?
what is the Connected Load (kW) or Contract Demand (kVA)of mahindra nasik plant??