How to Calculate the maximum Demand required for a
connected load for a manufacturing Plant
Answer Posted / yogish
There is no specific method to calculate the MD from the
CL. It really depends on the following: -
1. Type of industry: Continuous or Batch process, Heavy or
Medium or Small
2. Mechanical load or Heating load or Furnace load
3. Plant at infant stage or stabilised
4. Standby loads included
5. Largest single load and its starting method
6. Possibility of staggering load without affecting
activities.
7. Whether the major motors are optimally sized or oversized
We can get at some figure, only by experience in a similar
industry.
| Is This Answer Correct ? | 41 Yes | 25 No |
Post New Answer View All Answers
how to compute kAIC? with formulas...
all details of DG UPS HVAC
Do u know any one? how to find out in motor rated amps? formula?
Why do we apply both Differential and REF (HV and LV) protection schemes on YNyn configuration of a transformer?
what is ps impedance test
Wind mill
What is the purpose of stand by earth fault protection for transformer ?
When distance between two pulleys is not fixed, the tension of belt is adjusted by a) driver shaft b) driven shaft c) adjustment screw d) belt
Can anyone tell me some hints about what type of questions are asked by the interviewer by an Electronics engineer when company is installing an IPP and wants a team of engineers?
some basic standard questions on transformer.
What is the function of the generator exciter?
I am going to appear for the RRB Chennai Section Engineer online exam. Please send me the question papers from 2001 to date to my mail id:upendrakrishna20@gmail.com,plz send me ,or send any other rrb papers plzzzzzzzzzzzzzzzzzz
Name one of major transformer company in KSA ?
How can we convert 11 kv to 440 volt without using transformer ?
WANTCONTACT NUMBER & EMAIL/ WEBSITE TO CONTACT THE SECRETARY,MADHYA PRADESH LICENSING BOARD(ELECTRICAL),K- BLOCK,3RD FLOOR,SATPOODA BHAWAN,BHOPAL