Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to Calculate the maximum Demand required for a
connected load for a manufacturing Plant

Answer Posted / yogish

There is no specific method to calculate the MD from the
CL. It really depends on the following: -
1. Type of industry: Continuous or Batch process, Heavy or
Medium or Small
2. Mechanical load or Heating load or Furnace load
3. Plant at infant stage or stabilised
4. Standby loads included
5. Largest single load and its starting method
6. Possibility of staggering load without affecting
activities.
7. Whether the major motors are optimally sized or oversized
We can get at some figure, only by experience in a similar
industry.

Is This Answer Correct ?    41 Yes 25 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to compute kAIC?  with formulas...

4289


all details of DG UPS HVAC

2136


Do u know any one? how to find out in motor rated amps? formula?

2072


Why do we apply both Differential and REF (HV and LV) protection schemes on YNyn configuration of a transformer?

2196


what is ps impedance test

2177


Wind mill

1948


What is the purpose of stand by earth fault protection for transformer ?

2128


When distance between two pulleys is not fixed, the tension of belt is adjusted by a) driver shaft b) driven shaft c) adjustment screw d) belt

3061


Can anyone tell me some hints about what type of questions are asked by the interviewer by an Electronics engineer when company is installing an IPP and wants a team of engineers?

2244


some basic standard questions on transformer.

1851


What is the function of the generator exciter?

1462


I am going to appear for the RRB Chennai Section Engineer online exam. Please send me the question papers from 2001 to date to my mail id:upendrakrishna20@gmail.com,plz send me ,or send any other rrb papers plzzzzzzzzzzzzzzzzzz

2146


Name one of major transformer company in KSA ?

1258


How can we convert 11 kv to 440 volt without using transformer ?

1467


WANTCONTACT NUMBER & EMAIL/ WEBSITE TO CONTACT THE SECRETARY,MADHYA PRADESH LICENSING BOARD(ELECTRICAL),K- BLOCK,3RD FLOOR,SATPOODA BHAWAN,BHOPAL

2121