What is construction joint and
expansion joint in CC pavements
Answer Posted / mks
construction joint: provided where last concreting is done
and we have to continue further from there, hence to avoide
unhomogeniety in material construction joints are provided.
Expansion joint:provided to avoide developements of cracks
due to tempreture stresses. these are top to bottom or
partly saw cutted.
| Is This Answer Correct ? | 14 Yes | 6 No |
Post New Answer View All Answers
5. Do you feel that your present employer estimates your full work potential? Are they pleased with your work performance?
List out the types of roofs?
Difference between lime, distemper and plastic emulsion?
Wat is meant by Aecron brick?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
How to check slab shuttering level.? Or check list for slab ?
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
if dia of slab beam bar is38mm what its clear cover any method of provide clear cover
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
how to calculate the size of triangular ring in rcc column?
what is the mode of method of face bar measurement
What are the disadvantages while using stone dust as filler in pavements?
material used for mendrel use to bend epoxy coated rebar
4. Differentiate between NC and OC soils. Draw curves for (i) Stress vs Strain (ii) Volume charge vs Strain (iii) Pore pressure vs Strain for these soils
a concrete mix 1 2 4 by volume with water cement ratio as .6 by weight if moisture content in F.A is 6% with 20% BULKING AND IN C.A 1.5% by volume. find quantities of different materials required for one bag of cement