Answer Posted / farooq
if three sensors installed to measure or monitor one process
variable and when two of them give a high or equal to a set
value than an alarm or correcting action can be activated is
called 2 out of 3 automtion.
| Is This Answer Correct ? | 10 Yes | 1 No |
Post New Answer View All Answers
What is three element drum level control system why its better than single element?
what is a good line as ic engineer as maintenance ,oc, project, calibration ,validation engineer?
If a control valve is hunting means means if we are giving 50% to the cv, the cv will open at 51% then slowly slwoly it will reaches 49% , so what to do for solve this problem. The cv is double acting and mounted for anti surge operation, it having 4 nos. volume booster, one sov, one positioner, etc..?
all types instrumentation questions want
In dcs panel we are using diff type of modules ?what is module ? what is the use of modules ?diff type of module?
May I have a brief note above the voltage barriers? Whats is the purpose? Please mail me if you've operational details, mail id: rajkumar.diice@gmail.com
How to Calibrate Interface Level Troll in field
how radio frequency level probes works with its controller ? what is its principle ? pls give me brief explanation?
What is the purpose of the analyzer in petrochemical plant?
what is different between 2,3&4 wire rtd and how much maximum distance using plc to field.
I have 0.75mm sq multicore cable (IS type) , can use instead of same type but 1.5 sq mm cable ? Note : The distance is around about 150 meter.
Senior engineer's please help me, what is Loop Checking and Loop test? and write difference also? soon urgent
what are the documents(Construction point of view for a process plant) submitted by contactor initially entering in to new site for client?
for oil & gas industries which zone is normally preferred? why? give its example?
Which Signal hart communicator work? If there any signal change when hart connect while transmitter in line ?