Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is the difference between INVERTER and UPS?

Answer Posted / aravinda

AC TO DC THIS IS CALLED INVERTER
UPS MEANS UN INTERUPTED POWER SUPPLY INVERTER IS PORT OF
THE UPS

Is This Answer Correct ?    1 Yes 9 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Please explain, how to test vector group of tranformer(Delta y1) . Thank

1660


Why does amplifier gain reduce?

1009


How can I calculate per unit (KWH) fuel (Gas/ Diesel both) consumption 1MW unit?

2061


How is the speed of a DC shunt motor related to the armature current?

1129


what is the advantages og idmt relay over magnetic relay??

4179


while starting a liquid starter ,is there any volage drop on water/soda on tank.can we touch the tank on starting?

1866


R=*ΒΆ l/a

1575


In a tap changing transformer where is the tap connected, is it connected in the primary side or secondary side?

1079


what purpose to use excaiter in DG.?

2729


Define damping ratio.

1187


What are chief characteristics of state-space method and its techniques ?

2094


What is the formula for calculating impedance of transformers connected parallel at fault level 50KA?

2021


Details about Flux Compensated magnetic Amplifer starter for motors

1965


Comparision of Air break circuit breaker, SF6 Circuit breaker and vacuum circuit breaker.

2307


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

2769