Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much quantity of cement and sand required for
construction of 10 cum brick work( Brick size
3"*4"*9"(Standard size ) an d for 10 cum construction of SSM
(Size stone masonary) with Cm 1:6 for both.

Answer Posted / sjtbehera

you are given 3”x4”x9” standard size of bricks
After placing mortar it became- 4”x5”x10” =
10.16cmx12.7cmx25.4cm
No of bricks are required=
10/.106x.127x.254=3069 nos
The size of brick without mortar= 3”x4”x9”=
7.62cmx10.1cmx22.8cm
Then net mortar required =10-(3069*.076*.101*.228)
= 4.62cum
Due to frog filling, brick bonding course and
wastage add 15%
Volume of wet mortar= 4.62+4.62x15%=5.30cum
When dry increase this qty. by 1/3rd=
5.30+5.30x1/3=7.06cum
Ratio is =1+6=7 cement = 7.06/7= 1.06 = 29 bags
Sand= 7.06*6= 42.36cum

Is This Answer Correct ?    47 Yes 54 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to read the drawings to find the quantity of steel in a storm water manhole or any other structure?

2640


What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?

1853


What ingredients with% found in ppc cement??

2189


Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire

1670


What is the sugested procedure of water purification for public supply?

2364


can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now

2217


What is the difference between EPC,DBOOT and BOOT.

25040


weight of 1 cft 10mm, 20mm, 40mm aggregate weight of 1cft course sand

5277


Moisture content calculation for diff mix ratio's ??

1804


if dia of slab beam bar is38mm what its clear cover any method of provide clear cover

2104


how to calculate the dry wt of sand and cement for a required design mix?for ex:M20

2607


how i can tak Quantity of mortar in block work

2444


can you give me the details of rate analysis of steel and concrete?

3039


How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)

1952


what r the precaution for high in atp tempareture,low in atp tempareture

2101