Answer Posted / kk
if u want tune the controller.
this is compulsory to know process.
first check how much diffrence between SV-PV.
if ur pahese leading then change D value w.r.t time.not
longer time .it should too much smaller.
if ur phase laging then incerease I value.then it will
stablised in 4-5 cycle. cycle time should not be too much
more.
never PV overshoot to SV.
before tuning take the controller in Manual MODE.
in controller put the MV to cotrolled the Process.
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What are different types of valves?
Why humidity limit is 30 to 55 % for raw material storage?
How many interlocks at turbine? Plz explain briefly
Instrumentation symbols interpration, P& ID, Logic diagram analysis, Electrical drawing analysis.
i want to know the interview format fot gail, instrumentation. pls answer me in habib.sami1003@gmail.com
Draw a wheatstone bridge circuit showing supply, meter and 3 wire RTD connection
Isometric drawings are generated during _________________ phase of a project
line up procedure for dp type flow transmitter?
Draw bode plot of any transfer function. Why is plotting bode necessary?
What is the calibration procedure of Drum level transmitter if range is 0 to -400 mmh2o in lab?
Valve positioner and actuators in detail.
What is the function of solenoid valve in on/off & shutdown valve and why it is not used in control valve normally?
why we are not using the turbine flow meter in the steam service?
1.can you use SCADA instead of DCS,DCS instead SCADA 2.Difference between DCS and PLC,can their role be reversed i.e. role interchange 3.Difference between RTU and PLC
What is defferent betwen ESP &PCP PUMP .HOW IT IS WORK?