Method of findingthe dry ingredient quantity of 1 m3
concrete.
Answer Posted / naresh thakur
soppose, concrete mix ratio = 1:1.5:3
then, sum = 1+1.5+3 = 5.5
as we know,dry material required for 1 cum. of concrete =
1.54 cum.
then we can find -:
(1) cement = 1*1.54/5.5 = .28 cum. or .28cum.* 28.8= 8.06
bags.
(2) sand = 1.5* 1.54/5.5 = .42 cum.
or .42cum.* 35.3 = 14.83 cubic feet.
(3) coase aggregate = 3* 1.54/5.5 = .84 cum.
or .84 cum.* 35.3 = 29.65 cubic feet.
so, dry ingredient quantity required for 1 m3 of concrete-:
cement = 8.06 bags.
sand = 14.83 cft.
coarse aggregate = 29.65 cft.
do not forget to add 5 to 8 % addition matreial.
| Is This Answer Correct ? | 347 Yes | 36 No |
Post New Answer View All Answers
what is the meaning of degreasing of the euipment or line.
What are the reasons for geotechnical site investigations in uganda?
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
The foundations are placed below ground level, to increase?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none
What is the difference between routing maintenance and major maintenance in school facilities?
What is Refuse Area In High Rise Building ?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Will water damage concrete?
What are the uses of groynes?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?