HOW TO FIND OUT THE QUANTITY OF CONCREATE
Answer Posted / rajendra
As per IS:456-2000 code of ractice in Cu.m.&
in simple formula as follows:
Length(m)X Breadth/Width(m)X Height/Depth(m)=ans Cu.m
| Is This Answer Correct ? | 27 Yes | 2 No |
Post New Answer View All Answers
what is Short bored pile foundation.
If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
how u design STAGING for Superstructure in BRIDGE construction?
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
What is fineness modulus ? and its sieve # ?
what is E
what is the weight of 6000 psi concrete in lb/cft?
what is thumb rule for calculating the size of ISMB required for a particular length of span
What is the standard unit weight of Cast Iron pipe of 200MM Dia.(pipe specification is IS1538)
225 mm thick RCC slab, how many ton load slab can carry? for example if 33 ton truck loaded with soil, truck having 6 wheels. slab can take load or not? grade of concrete is M35 and slab design Fe500, slab desing one way slab.
Please tell me Detail cost of providing& laying nominal mix design 1:2.5:5,40mm nominal size.curing complete e/c cost of form work in foundation and plinth i/c carriage.
what motivates you to do a good job
what is the list of building construction equipment & teir output?