If the load of transformer is getting more than its
rating,,,than how to overcome this problem? Suppose thee
rating of transformer is 315kva and the load is going
beyond than the rating say around load: 352kva...
Than how can we solve this problem without deducting the
load.
Answer Posted / sagar hingmire
Dear friend,
If this thing is possible then no one will take the
required rated load equipments. Everyone will use under
rated equipments.
In your case only one thing is possible ie differentiate ur
load in three categaries 1.Important,2.Not much
important,3.Not important.
So when ever ur load goes beyond 315 kVA switch off type no
3 load categari.Only this is the solution.
| Is This Answer Correct ? | 16 Yes | 1 No |
Post New Answer View All Answers
Briefly define and explain the following different types of Pulse Amplitude Modulation (PAM) with some examples. i) 2-PAM ii) 4-PAM iii) 8-PAM iv) 16-PAM v) Quadrature Amplitude Modulation (QAM)
hello friend i wish to study a course related to the electrical construction, controlling and monitoring , which course i want to study? pls give me the name of institute?
what are the different methods for the starting of a synchronous motor.
Why do we require transformer with less specific weight if supply frequency is increased?
I want to know the 'Test voltage' for Tandelta testing of 3.3 / 6.6 / 11 KV Motors. Please explain
how can we make cable shedule for controll wiring ? which details must be required for it.?
When color of silica gel will gets change from blue to pink from Top to bottom?
If SFU is Switch Fuse Unit, What is the expansion for FSHF in Electrical Engineering?
I am getting above 60 V as open delta voltage against single phase unit ICT at tertiary delta formed and ICT getting trippped on NDR. ICT tested and found in order. PTs provided on tertiary are tested and in order. what may be the reason?
How will A Medium voltage circuit breaker(11 kV voltage level) operate under short circuit fault condition whether It is having short circuit release like Low voltage circuit breaker or relay should be given?
Advantages of using generator circuit breaker (GCB) scheme in a power station ?
If 22 KV HT line, Current transformer is 25/5 then how to calculate multiplying factor.
what are the values of VRY,VYB,VBR,Vry,Vyb,Vbr,Vrn,Vyn,Vbn for Magenetic balance test of 100 KVA and 63 KVA Distribution transformer
What is zero of the system?
What is “pu” in electrical engineering?