which concrete grade has highest strenth and what is its
comosition?
Answer Posted / narendra
With new concrete design methods the strength can go beyond
60. i.e. in petronous tower concrete used was 80 grade. its
composition is done with other additives like iron slag
powder etc., totally designed with coputers.
| Is This Answer Correct ? | 29 Yes | 6 No |
Post New Answer View All Answers
where tie beam is used? what is the pupose? what dimension of tie beam can provided and number and diameter of steel bars to be used between the columns of 1333mm and 1400.
Difference between pre-tensioning and post-tensioning.
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
How to design 12*12*14 room having rrc slab ,coloum, beam,foundation?
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
what is the minimum cement content for M20 & M25 as per is code -456(2000).
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
What is the average density of soil?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
How to produce the Concrete Grade 30mpa at 12hour? How to prevent for plastic shrinkage crack? How can we produce fire resistant concrete?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
How can I make justification between using concrete grade c35 compare c37?