Hi,please help me out with my ques:when a bug araises how
will we send the bug report to developer in which way?if
through mail means how which way?first to who we need to
send the report?
Answer Posted / deepthi
IF the project is using any bug reporting tool then the
tester assigns the bug to the developer by giving the
descrpiton of the bug by writing the reproducalbe steps and
Severity and Priority of the bug and where we are getting
this bug(Location) then assign this bug to the developer.
Otherwise u can send the bug details using either Excel
sheet ot Through Mail also
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Why testers wil prepare useracceptance testcases,system testcases and integration testcases,What is the differenece between all this test cases
Can anybody give me some tips on how to face telephonic interview and Write some expected telephonic questions as a 2+yr exp. in testing. Try to give Ques. that u already hv faced in telephone. Plz Help me out friends.
what is mean by Performance Related Testing in data base?
hai friends can u expalin about real time process of testing at the company, like flow diagram
how to verify a button size (e.g Login Button) on a web page have same dimension prescribed by Client in UI Testing..??
Differentiate verification and validation?
I am DD. I am working as a Tester in e-learning company? IS there scope for content testing? or i have to change to software testing. pls guide me...
Give me an example of something you tried at work but did not work out so you had to go at things another way.
Can you explain requirement traceability and its importance?
what is data guidelines
What types of testing is specifically important for web testing?
Hi guys,I have 3+ years of exp in manual testing in a bangalore based MNC company.I Like to jump in chennai.So please if u know any jobs in chennai firms please let me know in my email-id. anbarasu2k@rediffmail.com. cheers, anbarasu.
1.Acceptance testing involves procedures for identifying acceptance criteria for interim life cycle products and for accepting them.is that? 2.Acceptance testing occurs only at the end point of the development process; it should be an ongoing activity that test both interim and final products.is it?
How would u test and automate an Antivirus application ?
How would you test a service oriented architecture (soa) web application?