what are the types of Distribution transformer vector group
please explain
Answer Posted / amit3456
vector group shows the phase shift between winding, if it
is yndn11 it means primary is star and secondary in delta
and since the difference between star and delta is
30degree, so 360 is divided by 30 deg, it will divide in 11
posn.
| Is This Answer Correct ? | 8 Yes | 6 No |
Post New Answer View All Answers
What Is HO factor in power selection
hai friends i have BSNL JTO exam on next month so if any body have model question paper or give preparation tips to my mail id kumar4486@yahoo.co.in this will helpfull for my future .plz & thank u by kumar
what is the AC Plant and how can do the work with parts and picture tell us 150 Tr
How is the resonant peak, resonant frequency, and bandwidth determined from nichols chart?
What is the difference between Generator Differential Relay and Transformer Differential Relay?
Why mostly the HV side of transformer has Delta?
What tests should i carry over on a newly rewinded DC Generator with voltage rating of 38 volts and current rating of 350 amps, to certify that the machine is OK?
could you measure current in parallel?
I have doubt that the supply HZ (very low or high than rated ) may affect the power factor. is it true. ?
can any tell me why slope 40% and 80% is calculated in differential protection?
If we have to find the inductance of a dc shunt motor then by giving dc supply or ac supply and what is the reason for it. (this example is from "to determine the transfer function of a dc shunt motor ")
in the directional overcurrent and earthfault protection,normally we are setting the angle 45 deg lead for phase fault overcurrent and -45 deg lead for earthfault fro forward direction.but both the fault are operating on the same angle region only.why?how the relay will response?
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,
in Telecom DC system-why positive +ve is made earthed.and - ve is fed to load.
advantages & disadvantages of Lagging and leading power factor .