Is it mandatory statutory requirement of transformer oil
filtration annualy despite oil is withstanding required
dieelectrical strenth and all others parameters
Answer Posted / yokesh
at TNEB standards 40KV @1 min its a with stands the oil in
good condition. gap between two poles is2.5mm.
| Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
Please tell me the power flow from pmg to main rotor of an alternator (Including AVR unit)?
What if high voltage side circuit breaker of a ehv transformer instead of lvcb? Kindly elaborate.
how to calculate the lightning arrester conductor @ no of earth pits required
Will an earth leakage trip be activated if the component or wiring is faulty on low voltage equipment.Example An electrical Cat Scarer placed in the garden and water gets into the wiring.
If any HVDC line is going with positive & negative(the negative usually have return path of current with earthing electrode). Now the question is if this HVDC earthed electrode which is using as return path and earthed any nearby 400kv or 220kv AC substation equipments. which will be the impact of this on AC substation & its equipment, how severe may be this and what should be the minimum distance require between HVDC earthed electrode and AC substation equipments? It's really an high engineering level question...Dare to answer and increase your knowledge.
What is the disadventage of gland earthing(power cable) if any. ?
State norton’s theorem?
WHAT IS THE MEANING OG (li = 7 In)
Describe the test procedure to determine the vector group
Dear sir, In our plant have Station Transformer having capacity,i want to know, why LV side 40 - 40MVA is given? & how we can get 6.3 KV supply from tertiary(i.e. Open delta connection), Vector Group YNyn0 - yn0 +d MVA Rating 80MVA / 40 - 40MVA + 26.7MVA Voltage rating 420 (Tap range +6,to -10)81.25% /11.5KV - 11.5KV +6.3KV
why cable i burning without tripping. how can protect led street lights
How to design a Unit auxiliary transformer for a power house having a unit of 65 MW and Generating voltage of 11 KV and Secondary voltage of 433V
What facility we get after CT secondary earthing and how?
how can i find ct ratio of meter by seeing name plate of meter and how it should be used in MF calculation if it shows only-/1???
Please provided formula for calculate the cable size from step up transformer to M.V panel, run overhead aluminum cables, total load is 5mega watt, total length 900 feet.