Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what happen "when Dyn11 is parallel operation with Dyn1"?

Answer Posted / ramniveth

dear Murali
my reference is from oxford university from book
name "Automated Technology for verification and analysis"
"http://books.google.co.in/books?
id=LbfOjdII174C&pg=PA111&dq=transformers+oxford+university#P
PA111,M1"

Is This Answer Correct ?    1 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Why we are use dol starter up to 10 hp

1374


iam working in power plant. In hot places tube lights are glowing at the end portion only. what is the reason for that?

1927


Why the arms of delta in a delta-wye power transmission system are kept constant??

1872


why 5kW motor becomes unbalance if its relay trip 1st time and its set value is 7.0 A

2011


what is consequences of neutral and earth connect?

2121


Name a govt approved university which have 100% online engineering course.

1717


checking procedure of capacitor based motors.used in fans etc?

2122


What is class ab operation?

1054


What are different types of control systems?

1253


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

2028


which phase is preferred for connecting 1 phase vt used for synchronizing OHL? WHY?

2045


when elecromagnatic waves are propogated in a wave guide?

2008


This is urgent!! What is a Thyristor-based 3-ways selector switch with Zero crossing control? how does it operate and where is it mostly found in a system?

2069


While testing a ZCT what parameters have to check or measure?

2396


What is meant by short-pitched winding?

1209