My requirement is 1VA,50/5A Current Transformer for
Metering .If I select 15VA , 50/5A CT.Is there any
possibility of Technical Problem ?
Answer Posted / chandru_williams
no problem at all when we increase the burden . But It
should be noted that the current ratio should not be
increased, since it leades to sensing problem which inturn
hinders the metering values.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
i need to give section engineer (electrical engineer) for RRB. Please suggest some book
how the inner and outer body is separated in aircrafts?
can anyone give an idea about dia calculation in cold rolling mill
what is difference between isolation and ultra isolation transformer?, what is the method of testing ?
what is earth pit , how we can measured it, what earth rods reference
What is the technical difference between On delay timer and a Star delta timer?
What will be electrical cost per sqft for IT building (basebuild and fitout)and for residential township?
what is meant by 3rd hormonics ?
there are cam operated switches - why we call cam operated , What is cam ?
How we calculat the NGR of 3phase Generator, Our generation voltage 11KV
WHY CBCT USE ONLY IN Y PHASE NOT OTHER PHASES
what is the illumination level required for child play area?
diff. between tension mode & speed mode
what is meant by surge? what we called for high currents?
In a single how much maximum current and watts using