"Why you consider yourself suitable for the post"
Answer Posted / neetu banga
I believe that my knowledge, attribute, skills, working
experience, and inspiration that the position required
makes me suitable candidate for this post. I can
confidently carry out the task mentioned in your job
description. I consider myself a committed team player who
also relishes challenges and readily assumes responsibility
and accountability in a personal performance role where
initiative is vital. The software expertise gave me a good
foundation to build on. I can add value and make a
worthwhile contribution to the company’s growth with
technical essentials which I have gained during my past
service career. My attitude and temperament best suits the
nature of the job. And therefore, I am eager to enter in a
new working environment. I would like the opportunity to
contribute to the efficient operation of a well known
company and to earn advancement through on-the-job
performance.
Is This Answer Correct ? | 1095 Yes | 64 No |
Post New Answer View All Answers
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
What is Grid floor and mention its advantages ?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
What are the responsibilities of a construction manager?
how to calculate load bearing column
how we calculate the grade of the Bituminous materials.?????
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
In jack arch floor, the rise is kept?
to draw bm diagrams for portal frames under different loadings//
What is difference between code and standard and specification?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
explain the advantages of total stasion
what does the grad of cement shows (denotes)?
How do You Maintain a structure after getting cube test of low strength.
How do you calculate the power of a centrifugal pump?