Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

a voltmeter shows 100v..wat is to be done to make it read 150v.

Answer Posted / manoj sharma

Ther are following solutions.
1. increase the souce voltage up to 150V, which is being
measured by voltmeter.
2. volt meter measure the voltage by a niddle which is
clibrated to show difflection acording to magnetic force
develored in the potential coil. So increase the number of
turns up to 1.5 times of present no. of turns.
3. Replace the potential coil with new coil having
inductance 1.5 times of present potential coil.
Any way but why you want to do so.....plz tell me geetha...

Is This Answer Correct ?    0 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

when it is possible kvrah lead & fundamental kwh be equal in electonic trivector meters (3 ph)

1990


how we can calcultae the short circuit level for bus bar

2235


why Induction Generators are not "Black start" ? and apart from WTGs where this types of generator are generally used?

2645


what is metering cum synchronizing panel and how it is used?

4638


CPC cable .PVC \1C....I want to get sure that type is flexible indoor or to be install on trench. please advice .thanx :)

1838


What is trip and closing coil in cb? Why need of them

1510


A 100KVA SINGLE PHASE TRANSFORMER 10000/200V,50HZ REQUIRES 300V AT HV SIDE TO CIRCULATE FULL LOAD CURRENT WITH LV SHORT CIRCUITED.THE INTAKE IS 1000W.THE % OF REGULATION ON FULL LOAD AT 0.8 PF LAGGING WILL BE HOW MUCH AND THE SECONDARY TERMINAL VOLTAGE ON 0.8 PF LEADING WILL BE

2574


IF I KNOW THE AREA OF CROSS SECTION OFTHE WIRE , WATTAGE OF THE LOAD ,VOLTAGE SUPPLY WHAT IM GIVING TO THE LOAD AND ALSO POWER FACTOR OF LOAD ....... SO GIVE ME FOR WHAT AMOUNT OF CURRENT I SHOULD USE WHICH TYPE OF CABLE?

1889


if there are six generators (3 gas CATT, one Jenbacher o1 MW each, and two nos Diesel 01 no 01 mw other 0.65mw EDGs ( say), 3 CAtt gas set have identical pole pitch,01mw EDG and Jenbacher gas Set have different pole pitch, how their power connection can be done to connect a common bus bar during installation. in short, how different pole pitched generators power connection can be done to connect a common busbar system through generators incomer ACBs.

1596


witch pump used in wtp

2101


What is BusBar integrity test and how it is conducted?

2254


what is data block in plc ? How the values of data block are written and read by hmi ? what is the difference between function and function block ?

3413


exolain the star delta connection

2674


How a band pass filter is constructed?

1061


how to i get B licence,i am completed BE electircal and electronics engineering.i want to konw the proceduure to get b licence

1734